H12-322 Exam Questions

Total 277 Questions

Last Updated Exam : 16-Dec-2024

Topic 1, Exam Set A

In WDS point-to-multipoint mode, how many Leaf APs can I connect to a single Root AP?


A.

2


B.

4


C.

6


D.

8





C.
  

6



From the perspective of signal coverage, roaming reliability depends on the planning of the overlay overlapping area.


A.

True


B.

False





A.
  

True



The following is true about the AP installation location?


A.

For aesthetic needs, priority can be given to placing the AP on the ceiling.


B.

If the site is a monolithic ceiling, the AP should be considered as close to the maintenance port.


C.

The material of the ceiling is generally thin, and the impact on the cover is negligible.


D.

When wall-mounting or installing under the ceiling, it may be necessary to punch holes. When surveying, try to confirm with the property whether it is feasible.





A.
  

For aesthetic needs, priority can be given to placing the AP on the ceiling.



B.
  

If the site is a monolithic ceiling, the AP should be considered as close to the maintenance port.



D.
  

When wall-mounting or installing under the ceiling, it may be necessary to punch holes. When surveying, try to confirm with the property whether it is feasible.



Basic requirements for WLAN network construction include bandwidth requirements, coverage targets, coverage methods, field strength requirements, and power distribution methods. Determining the strength of the coverage area in the field strength requirement is adjusted by the AP transmit power. The following statements are correct regarding the requirements that the network regulation needs to consider in advance. Is it?


A.

The field strength demand in key areas is that the main online area of the user can be controlled at -40~-80dBm. If the power is too strong, it will easily lead to receiving overload, and the power is too weak. Will cause the connection rate to drop


B.

The interference field strength requirement is that the same-frequency interference in the same area is not more than -80dBm


C.

The fringe field strength level combined with the receiving sensitivity and edge bandwidth requirements are generally selected above -75dBm


D.

The leakage field strength of the system should not be too large, and the field strength at 10m of the external network of the building cannot be greater than -90dBm.





B.
  

The interference field strength requirement is that the same-frequency interference in the same area is not more than -80dBm



C.
  

The fringe field strength level combined with the receiving sensitivity and edge bandwidth requirements are generally selected above -75dBm



D.
  

The leakage field strength of the system should not be too large, and the field strength at 10m of the external network of the building cannot be greater than -90dBm.



Which of the following is true about the WLAN Survey Pad tooling method?


A.

Supporting finger operations during the process of drawing obstacles, moving the scaled drawings to find the best position to draw obstacles, does not support increasing obstacle types


B.

The industrial survey tools and planning tools need to be used together. First, get the drawings, first use the planning tools to make a simple plan for the project, and then take the Pad to the present. Work on the site, then export the project and import it into the planning tool for further planning.


C.

Create a new project, select the floor node, see the corresponding building thumbnail in the preview box on the right, click on the thumbnail to enter the selected floor to supplement the survey information.


D.

Pad's industrial survey tools and planning tools are suitable for pre-sales network regulations, and WLAN test tools are used for post-production verification before delivery.





B.
  

The industrial survey tools and planning tools need to be used together. First, get the drawings, first use the planning tools to make a simple plan for the project, and then take the Pad to the present. Work on the site, then export the project and import it into the planning tool for further planning.



C.
  

Create a new project, select the floor node, see the corresponding building thumbnail in the preview box on the right, click on the thumbnail to enter the selected floor to supplement the survey information.



D.
  

Pad's industrial survey tools and planning tools are suitable for pre-sales network regulations, and WLAN test tools are used for post-production verification before delivery.



What are the calculations for implementing controller hot backup?


A.

Dual link backup


B.

HSB+ dual link backup


C.

HSB+VRRP


D.

5G priority access





B.
  

HSB+ dual link backup



C.
  

HSB+VRRP



Which of the following tools can an engineer use when planning a WLAN network?


A.

WLAN Planner


B.

WLAN Tester


C.

Mobile phone


D.

Telescope





A.
  

WLAN Planner



The AP9330DN has 12 radio ports, including six 2.4 GHz radio ports and six 5 GHz radio ports.


A.

True


B.

False





B.
  

False



The AC is configured as follows. How long does it take to open RTS/CTS when the length of the packet exchanged between the terminal and the AP?
[AC6605-wlan-view] radio-2g-profile name default
[AC6605-wlan-radio-2g-prof-default] rts-cts-mode rts-cts
[AC6605-wlan-radio-2g-prof-default] rts-cts threshold 1500


A.

<1500 Byte


B.

1500 Byte


C.

>1500 Byte


D.

1024 Byte





C.
  

>1500 Byte



During the establishment of the dual-link backup active/standby CAPWAP tunnel, which of the following parameters should be included in the Discover Response sent by the active and standby ACs?


A.

Dual link characteristic switch


B.

IP and priority of the respective AC


C.

IP and priority of the respective AC


D.

Configuration files of the respective ACs


E.

Forwarding mode of each service set of AC





A.
  

Dual link characteristic switch



B.
  

IP and priority of the respective AC



C.
  

IP and priority of the respective AC




Page 8 out of 28 Pages
Previous